English  |  Française

Centre Complexe Multisports

St. Eustache, Québec (2007)

Design engineer responsible for the foundation design of the Soccer Sports Stadium consisting of 332 ft x 222 ft by 55 ft high free-spanning prefabricated steel structure.

Client: ASPA (Association du Sports et du Pleine Aire  de St-Eustache) Inc.
Total Cost of project: 7.5 M $