
Centre Complexe Multisports
St. Eustache, Québec (2007)
Design engineer responsible for the foundation design of the Soccer Sports Stadium consisting of 332 ft x 222 ft by 55 ft high free-spanning prefabricated steel structure.
Client: ASPA (Association du Sports et du Pleine Aire de St-Eustache) Inc.
Total Cost of project: 7.5 M $